Savings verification: Cut cost without trading away reliability
A cheaper cluster that pages someone at 3 a.m. is not a saving. FusedOne can add a reliability baseline to a cost assessment, measured by a method you sign off in advance, and compare before and after in a separate engagement once your team has applied the changes.
- Cost changes are blocked because nobody can prove they are safe
- There is no agreed baseline for latency, error rate or SLO burn
- Savings are reported, but nobody checks what they did to latency or errors
- An earlier cost cut caused an incident, and the next one is hard to approve
What you walk away with
Scoped in writing before work starts, for a fixed fee.
How an engagement runs
Assess
Fixed fee. Deliverables and a fixed delivery period are agreed in the written scope before work starts; the period begins on the day the agreed access is in place and checked. Workload profiling and cost analysis across compute, storage, network transfer and ML pipelines, from your billing exports, cluster and storage metrics, and workflow run history. You receive a ranked savings plan with a low / expected / high range, every assumption printed, and a measurement baseline you sign.
Implement
A separate, fixed-scope follow-on engagement that puts the top findings into practice — autoscaling, scheduling, policies and dashboards — through your own review and change process. Nothing changes without your team’s approval.
Hand over — you own it
Runbooks, dashboards and configuration live in your repository. No licence fee, no per-CPU subscription, nothing left running that phones home. Results can be measured against the baseline signed in step one, in a separate verification engagement.
Related solutions
Start with a 30-minute sanity check
An outside read on the cost mechanisms most worth checking, and whether a full assessment is worth it.